NEWS

How to Use Concrete Mixer?

  • Categories:Company dynamics
  • Author:
  • Origin:
  • Time of issue:2020-10-09 15:17
  • Views:

How to Use Concrete Mixer?

  • Categories:Company dynamics
  • Author:
  • Origin:
  • Time of issue:2020-10-09 15:17
  • Views:
Information
1.Concrete mixer should be installed on a solid pedestal.When long-term fixed,embedded anchor bolts,wooden pillow should be on a stand and find lie flat and stable in the short-term use.
 
2.On the concrete mixer console,the operator shall see all parts of the work.Mat rubber plate or dry wood in electric mixer console.
 
3.Motor and electrical components wiring firmly,and protect access to zero or grounding resistor compliance.
 
4.Before operations,hopper lift test should be carried out,clutch&brake should be observed and confirmed flexible and reliable.
 
5.Fastening the transmission mechanism,working equipment,brakes are fastening&reliable,open gears,pulleys have shield.
 
6.When blenders job,hopper is raised,forbid any person stay or through the hopper,when needing to repair or clean up material pit under the hopper,bucket elevator should be pin locked with chains or insert.
 
7.Feeding to the stirring tube should be in operation,adding new material should be first stirred barrel before all the original concrete discharged.
 
8.After working,do comprehensive clean-up of the concrete mixer,when the operator enter the barrel,you must cut off the power or remove the fuse and lock the switch box,"DO NOT TURN"signs hang,and there is someone outside the guardianship,clean-up work the venue,cut off the power,lock switch box.

Scan the QR code to read on your phone

News

Copyright © Lawn and Garden Products Co.,Ltd       鲁ICP备12027876号       POWERED BY WWW.300.CN

这是描述信息

Copyright © Lawn and Garden Products Co.,Ltd  

鲁ICP备12027876号 POWERED BY WWW.300.CN

鲁公网安备 37068302000353号

Lawn and Garden Products Co.,Ltd